100 Antibes Drive, Toronto

    CONSULTANT: Davroc & Associates Limited

    PROJECT VALUE: $500,000.00

    SCOPE: Hydrodemolition, Slab Replacement and Waterproofing


    The work was carried out in 12 weeks.

    • shoring design and installation
    • ramp slab design and engineering
    • traffic topping installation





    <<   back to Projects         ||         back to Top   >>


© copyright 2007 Can Mar Contracting Ltd.